Asanko Gold Ghana Limited (AGGL) – 2025

Description of Works:

Transportation and offloading of HDPE liner rolls, anchor trenching, spreading and installation of HDPE liners, backfill of anchor trench, QAQC test and patching of Asanko tailing storage facility stage 8A – 2025

 

Scope:

  • Transportation of HDPE Geomembrane liners
  • Offloading of HDPE Geomembrane liners
  • Excavation of anchor trench
  • HDPE installation, wedge, welding and backfilling of anchor trench
  • QAQC Test and patching

No Image Found