Description of Works:
HDPE polypipe and geomembrane lining and geotextile (Bidim A24) installation works at TRDT 4 junction.
SCOPE:
- Transportation of HDPE Geomembrane liners
- Offloading of HDPE Geomembrane liners
- Excavation of anchor trench
- Cutting and Welding of 400–450mm Polyethylene (HDPE) Pipes
- Installation of Geotextile Fabric and HDPE Liner

