Description of Works:
HDPE geomembrane installation, welding and backfilling of anchor trench at Asanko tailings storage facility stage 7
SCOPE:
- HDPE Geomembrane installation, wedge, welding and backfilling of anchor trench
- Inspection and extrusion works of patches on existing installed Hdpe Geomembrane
- Air Pressure tests
- Inspection of defects
- Destructive Tests
